Project name: construction of WDP Industrial Park Deva
Objective: 3D survey site study/floor flatness/floor plans/determining BOMA rentable spaces
Deliverables: floor flatness analysis in .dwg/floor plans (2D survey)/3D survey site study – 3D topographical survey
Scanned surface: 90.000 sqm
Equipment used: Trimble TX8 / Trimble S5 Total station
Activity / Workflow (office and on-site ):
- acquisition of site located in Deva
- establishing the positioning for the scanning stations and the resolution used according to the degree of detail required by the design theme
- recording the point cloud and placing it into the Stereographic 70 projection system
- extracting floor plans using AutoCad software
- calculation of leasable areas according to BOMA standard.