A0 Highway

Stakeout designed points for the layout of the roads crossing the A0 highway, layout of designed elements for the arrangement of roadways overpassing the A0 highway in the Bucharest Southern district

  • The volumetric quantities of material required for settling the completed works were determined

Equipment used: Trimble S5 total station and Stonex GNSS receivers were used for the execution of the topo-geodesic works